1. The paint construction of the frame building has been completed, the external wall scaffolding has been completely removed, the entire south side glass window has been installed, the roof waterproofing project has also been completed, and the installation of the fire water storage tank is currently underway;
2. The installation of roof tiles and wall panels in the steel structure area has been completed, and the floor construction is also nearing completion. In the next stage, the water and electricity team will complete the installation of fire pipes and fire boxes;
3. The second phase of the construction site supporting project started on June 12th. The construction team cleared the weeds, miscellaneous trees, and construction waste in the area inside the west wall. Currently, parking spaces and road infrastructure have been marked, and the excavation of drainage ditches, pouring of cushion layers, and construction of water retaining walls on the inside of the west wall are proceeding in an orderly manner.

The construction of the second phase of the construction site is progressing vigorously. At the same time, the scorching summer has quietly arrived, with high temperatures and high-intensity construction intertwined, undoubtedly posing a daunting dual test for the construction team. For the construction team of the second phase construction site project of the company, they bear heavy pressure, including strict quality control of the project, strict monitoring of on-site safety, timely investigation of hidden dangers, fine management of material entry and exit, accurate registration of personnel attendance... In order to ensure the progress of the second phase construction site project of the company, every task cannot be taken lightly.

Flier Refrigeration Engineering Technology Co., Ltd is a professional technical service enterprise integrating central air-conditioning host sales, spare parts sales, unit repair and maintenance.

Factory located in Zhenjiang, Jiangsu, covering an area of 25,000 square meters ,and has been built with 1 R&D center, 1 pilot plant, 3 An innovative production, learning, and research base composed of a professional production workshop and its corresponding infrastructure. At present, the company has become a well-known technical service provider in the field of central air conditioning in China.
The company's main business scope includes: central air-conditioning maintenance, cleaning and technical services; cooling tower and fan coil cleaning and maintenance services; custom processing of lithium bromide solution; sales of lithium bromide solution special impurity separators; central air-conditioning host and various zero Sales of accessories; installation and sales of central air conditioning systems, etc.
Tel: + 86 15358588768(Whatsapp)
Wechat:15358588768
E-mail: mdguolijuan@zjflier.com